What We Do

Replace Fuel Pump House

Full Pump House

Location: Barksdale AFB, LA

Client: NAVFAC Southeast

EMR was responsible for the demolition of the existing pump shelter and support structures, construction of site improvements and infrastructure, and installation of a new Fuels Type III hydrant pump house (Pre-Engineered Metal Building) with bridge crane and five 600 gallons per minute fuel pumps and filter separators. The project included a product recovery system, surge suppressors, HHT check out station, 8-inch and 16-inch tie-ins to the existing hydrant system, control system, motor control and programmable login controls center, manual transfer switchgear for the existing generator, and all utilities.