Zone 7 Munitions Storage 7000 Area

Location: Tyndall AFB, FL
Client: USACE

Contracted for $27.5M, EMR will embark on the design and construction of magazine storage facilities, a missile assembly shop, and renovation of multiple MSA facilities. The facilities include reinforced concrete foundation and floor slab, structural steel framing, fire suppression, masonry block and insulated metal walls, and standing seam metal roof. The facilities will include concrete walls and roofing for appropriate design to enclose weapons, with magazine and facility systems maintenance. The project includes all utilities, site improvements, pavements, detection/protection features, security enhancements and other supporting work.

<< Return to Projects Page

If you have any questions or would like any additional information please click the button below.