Replace Chilled Water Piping B3909

Location: NAS Pensacola, FL
Client: NAVFAC Southeast

Design and construction to replace the underground chilled water distribution piping system at the Naval Air Technical Training Center. Work included replacing all piping from the mechanical plant (Building 3909) to all barracks (Buildings 3901-3908 and 3910), the Galley (Building 3900), the Medical Clinic (Building 3911), and the Enlisted Club (Building 3912). The new pipe was installed up to the locations of existing isolation valves at all twelve buildings served. New gate valves were installed where the new piping connected to the existing. Existing piping from the isolation valves to the buildings remained in place for use. The project site covered approximately 3,600 linear feet where new chilled water piping was installed. The new chilled water piping crossed under four roads that were to remain in use. Underground directional boring was utilized in these areas to not disturb the flow of traffic.

<< Return to Projects Page

If you have any questions or would like any additional information please click the button below.