EMR was awarded a $4.8M contract at NAS Whiting Field in Milton, FL for the construction of temporary facilities for helicopter simulators. The temporary facilities project provides temporary space and supporting spaces for Helicopter Training simulators; including concrete pads, utility extensions, up to five lease years for the temporary facilities (design, assembly and installation of temporary, relocatable structures for the training simulators and support spaces such as administrative, restroom and breakrooms). The structures will be temporary in nature and require removal from the site once permanent facilities are available.