Egress Shop

Egress Shop

Egress Shop

Location: Columbus, MS

Client: USACE

USACE awarded EMR with a$5.2M contract in April 2025 for the Design-Bid-Build construction of an Egress Shop for the T7 aircraft.

Temporary Maintenance Hangar, NAS Whiting Field

Temporary Maintenance Hangar, NAS Whiting Field

Temporary Maintenance Hangar, NAS Whiting Field

Location: Milton, FL
Client: US Air Force

EMR was awarded a $17M contract at NAS Whiting Field in Milton, FL for the design and build of a Temporary Maintenance Hangar. The purpose of the project is to provide adequate temporary hangar space and supporting spaces for helicopters. The Temporary Maintenance Hanger will be a single-story pre-manufactured tension fabric structure with metal building framing and a fabric membrane founded on a concrete slab and foundation system.

Repair and Modernization of Hangar 57

Repair and Modernization of Hangar 57

Repair and Modernization of Hangar 57

Location: NAS Corpus Christi, TX
Client: NAVFAC Southeast

EMR was responsible for the two-phase renovation of Hangar 57 to bring the hangar into compliance with applicable codes and regulations and restore its structural integrity. The renovation included 40,000 square feet of hangar space and 20,000 square feet of office space. Engineers and testing labs were employed to determine the extent of repair required to the existing structure. 

The project involved lead abatement and epoxy painting of the structural steel in the hangar; demolition and replacement of the air conditioning system including a new chiller, boiler, air intake units, and fan coil units; installation of new compressed air lines, compressors, and tanks; interior office renovations including asbestos abatement, new ceilings, and floors; complete renovation of restrooms; and new site and runway paving. EMR also assessed the condition of the foam fire suppression and wet fire sprinkler systems and made all required repairs. Hangar 57 remained in operation during all phases of this project.