Q4 Repairs to Corry “A” School BEQs 3707 and 3708

Q4 Repairs to Corry “A” School BEQs 3707 and 3708

Q4 Repairs to Corry “A” School BEQs 3707 and 3708

Location: Corry Station, NAS Pensacola, FL
Client: NAVFAC Southeast

EMR received the task order to renovate Buildings 3707 and 3708 at Corry Station (52,500 square feet), which is the Navy’s Center for Information Dominance (technical training center). These buildings are part of a complex built in 1975 that consists of 10 buildings, 3701 through 3710. Buildings 3707 and 3708 house 192 “A” School students. Building 3707 is a three-story Bachelor Enlisted Quarters (BEQ) providing (49) 2+0 Quarters with 98 berths. Similarly, Building 3708 has three stories and provides (47) 2+0 Quarters with 95 berths. 

The project included the interior demolition and renovation of each building to accommodate the Navy layout for the 2+0 BEQs. The interior partitions were reconfigured to meet the program space requirements and have new interior finishes. Modifications were made to the exterior brick and stucco façade for the installation of new doors and windows. A new walkway was added on three sides of each building to allow access to the quarters from both sides of the building. The existing stairs were replaced with freestanding stair towers to meet current code requirements. A new structural framing system was built to support the new walkways and a new sloped standing seam metal roof was constructed. The renovation required structural modifications, installation of HVAC, electrical, plumbing, fire protection, and security systems.

Construct Terminal Engagement Center (TEC)

Construct Terminal Engagement Center (TEC)

Construct Terminal Engagement Center (TEC)

Location: Eglin Air Force Base, FL
Client: USACE

EMR was awarded a $4.2M contract to construct a Terminal Engagement Center Facility, 8,284 sf of concrete foundation, steel studs, exterior insulated foam core metal wall panel, and standing seam metal roof. The facility will include Office Spaces, Optics Labs, Behavior Room, Histology Area, Conference Rooms, Break Area, Restrooms, Storage, Mechanical, Electrical, and Communication Rooms. Supporting facilities include parking, lighting, utilities, walkways, and fire suppression. Project is designed IAW DoD Minimum Antiterrorism Standoff Distances UFC 4-010-01, barrier-free design IAW DoD ABA Accessibility Standards. The project is located at Eglin AFB, FL.

Renovate Building 18-C

Renovate Building 18-C

Renovate Building 18-C

Location: Eglin Air Force Base, FL
Client: USAF

EMR was awarded a $5M contract for the complete interior renovation of a 15,000 sf facility known as building “18-C”, which was originally the dining hall and administrative support spaces for Dormitory 18. The existing facility is a cast-in-place (CIP) reinforced concrete post & beam structure with concrete masonry unit (CMU) infill walls. The roof is a low-slope membrane surface that is relatively new, existing to remain, and beyond the scope of this project. This project will produce a new Special Access Program Facility in full accordance with referenced regulations.

Construct NEX Fleet Store / Gas Station

Construct NEX Fleet Store / Gas Station

Construct NEX Fleet Store / Gas Station

Location: Norfolk NAS, Northwest Annex, Chesapeake, VA
Client: NAVFAC Mid-Atlantic / NEXCOM

Design-Bid-Build NEX Gas Station/Mini Mart project included a new Gas Station, Grocery, and Barber Shop for the Navy. EMR provided a complete refrigeration system, including a walk-in cooler and reach-in refrigerated and frozen food cases. Complete fuel system, including a 15,000 split tank for diesel, regular, and premium fuel. Veeder Root Monitoring System, Wayne Fuel dispensers, and Commander Credit Card Payment System were included. The system was fully tested and inspected and all required permitting was provided. This project was LEED Silver.

Construct Eglin AFB Aircraft Rescue and Firefighting (ARFF) Development Facility

Construct Eglin AFB Aircraft Rescue and Firefighting (ARFF) Development Facility

Construct Eglin AFB Aircraft Rescue and Firefighting (ARFF) Development Facility

Location: Destin-Fort Walton Beach Airport, Eglin Air Force Base, FL
Client: Okaloosa County for Eglin AFB

New construction of Aircraft and Rescue Firefighting (ARFF) Development Facility. This 8,599 sf building gives the Eglin AFB firefighters permanent access to air emergencies, allowing access times to any point on the runway to be within FAA-required response times. Pre-engineered metal building and split face CMU structure is composed of three spatial divisions: administrative, support, and bunk areas, and a three-engine truck bay.