Hurricane Sally Recovery Package 7A

Hurricane Sally Recovery Package 7A

Hurricane Sally Recovery Package 7A

Location: NAS Pensacola, FL

Client: NAVFAC

Out of five proposals, EMR was selected as the recipient of a firm-fixed-price task order in the amount of $12M to make repairs to Buildings 4149 and 646 which will include work on the roof, exterior envelope and interior repairs such as the fire alarm system, heating, HVAC, lighting and more.

Cryogenics Facility

Cryogenics Facility

Cryogenics Facility

Location: Marine Corps Air Station, Beaufort, SC
Client: NAVFAC

Naval Facilities Engineering Systems Command Mid-Atlantic awarded a $10.8M contract to EMR, Inc. to construct a cryogenics facility. Included in this low-rise cryogenics facility is an administration/maintenance section, a liquid oxygen/nitrogen production section, and a covered storage area for gas cylinder storage.

Main Gate Relocation

Main Gate Relocation

Main Gate Relocation

Location: Patrick Space Force Base, FL
Client: USACE

EMR was awarded a $12M for the Design and Construction of a main Entry Control Facility (ECF) for Privately Owned Vehicles (POV) including a visitor center, POV gatehouse with canopy and ID check stations, POV inspection facility and a POV overwatch at Patrick Space Force Base.

Zone 5 CE Maintenance Shop & Storage Area

Zone 5 CE Maintenance Shop & Storage Area

Zone 5 CE Maintenance Shop & Storage Area

Location: Tyndall AFB, FL
Client: USACE

EMR was presented with a Notice of Award in the amount of $19M for the design and construction of Tyndall’s Zone 5 CE Maintenance Shop & Storage Area which will result in complete and usable facilities including a base engineer maintenance shop and storage shed, base civil engineer open storage, grounds facility, and air filter storage facility.

Zone 7 Munitions Storage 7000 Area

Zone 7 Munitions Storage 7000 Area

Zone 7 Munitions Storage 7000 Area

Location: Tyndall AFB, FL
Client: USACE

Contracted for $27.5M, EMR will embark on the design and construction of magazine storage facilities, a missile assembly shop, and renovation of multiple MSA facilities. The facilities include reinforced concrete foundation and floor slab, structural steel framing, fire suppression, masonry block and insulated metal walls, and standing seam metal roof. The facilities will include concrete walls and roofing for appropriate design to enclose weapons, with magazine and facility systems maintenance. The project includes all utilities, site improvements, pavements, detection/protection features, security enhancements and other supporting work.